The Fast Growth of Large-Scale Solar Industry May Be Potential Risk Quality

The Australian large-scale solar industry may be at risk of quality issues as reported by PV Magazine.

Large-scale quality may suffer from incorrect handling and installation as well as botched electrical wiring. The main concern is inexperienced installers and construction teams rushing to meet deadlines and getting the installation wrong.

Microcracks caused by mishandling, incorrect stacking of panels, dropping or even walking on modules are not uncommon when inexperienced contractors and installations teams are used. The module back sheets can also be ripped, scraped or torn.

PI Berlin is usually called in to inspect underperforming PV power plants. The firm uses infrared cameras as their diagnostics tool in identifying hotspots caused by cracked cells and faulty wiring.

Click here to read the full story on PV Magazine

 

The STC In-Depth Guide to Solar Power Warranties

Buying solar power products is always going to be an exciting event. This is the case whether it’s the first time, or one of many times. When all...

Read More

Assessing the Federal Election Outcome for Australian Solar and Sustainability

On Saturday 21 May Australia’s federal election was held. From a renewables and sustainability perspective (among other factors) the outcome of this...

Read More